Sunday 16 December 2012

Project: Extension - Week 4

Another week has passed and it is clear that the two parts of this project are proceeding at different rates. We now have electricity and water in our new room. We don't have a door or a radiator or any lights or any electrical sockets. Interestingly, the floor is already borderline too high, and there is supposed to be some stylish laminate flooring going on top of it yet. (Only the badly fitting stuff is stylish, maybe this will be well fitting and boring.)

Nothing very exciting happened. Some drilling, some digging, some banging - the usual sort of stuff. We haven't lost any more mugs either. Although Winnie the Pooh is clearly visible, but tantalisingly out of reach in the room we can't get into.

The bridge of Khazad-dum



We have plasterboards and windowsills.

There is a new wall on the drive for me to hit when I attempt to maneuver the car into the garage.



That's not actually a door, just a piece of wood screwed over a doorshaped hole.

I quite like how this mound of rubble and assorted crap gives the garden hight. You can achieve much the same effect with some plants.

No scaffolding!


This pile of debris is even bigger than the one round front.


We have an outside tap again!

Although it looks like a trendy shop-like awning , I suspect that stylish sheet of black plastic will be removed at some stage.